Objectives

  • Provide continuous, uninterrupted gas supply.
  • Improve safety by eliminating in-home cylinder storage.
  • Reduce energy costs through bulk purchasing and efficiency.
  • Establish modern utility infrastructure increasing property value.

Licensing & Regulatory Requirements

SSA

Site suitability inspection and approval.

ATC

Engineering review and construction approval.

LTO

Final inspection and operational license.

Gas Storage Facility

  • 1–5 ton LPG storage tanks
  • Ventilated tank farms with safety distances
  • Fire suppression and hydrant systems

System Overview

  • Pressure regulation & manifold system
  • HDPE/steel underground pipelines
  • Apartment copper/PEX lines with meters
  • Smart monitoring & emergency shutdown

Implementation Plan

  1. Feasibility Study (2–3 weeks)
  2. Design & Engineering (3–4 weeks)
  3. Procurement & Installation (6–8 weeks)
  4. Testing & Commissioning (1–2 weeks)
  5. Handover & Training (1 week)

Budget Estimate (Indicative)

  • LPG tanks and accessories
  • Piping and distribution network
  • Smart meters
  • Leak detection systems
  • Installation, approvals and contingency

Regulatory Compliance

  • DPR / Gas Authority approvals
  • Fire Service approvals
  • Environmental & safety assessments
  • Building control regulations