Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Pillar Padding Maintenance
Protecting vehicles, infrastructure, and people through smart safety design.
Download Brochure
Objectives
- Protect vehicles from accidental pillar collisions
- Protect structural pillars from impact damage
- Improve driver safety and confidence
- Enhance professional appearance of car parks
- Reduce long-term maintenance costs
Background & Problem Statement
Car park pillars are frequently exposed to accidental impacts during parking and maneuvering, resulting in vehicle damage, structural wear, increased maintenance costs and safety concerns.
Scope of Work
- Site inspection and measurement
- Supply of high-quality padding materials
- Installation on designated pillars
- Final inspection and handover
Health, Safety & Environmental
- Minimal disruption during installation
- Compliance with safety regulations
- Non-toxic and environmentally friendly materials
Project Timeline
- Site inspection: 1 day
- Material supply: 3–5 days
- Installation: 1–2 days
- Final inspection & handover: 1 day
- Total duration: 1 week
Design & Coverage
- Padding thickness: 20–50mm
- Height coverage: 1.0m – 1.5m
- Secure adhesive and mechanical fixing
Installation Method
- Surface cleaning and preparation
- Accurate alignment and positioning
- Durable and vandal-resistant fixing
Get in Touch
Email: johnson.f@sjsltd.com.ng, info@sjsltd.com.ng, sales@sjsltd.com.ng
Phone: 08181012229, 08089644082
Address: 10, Jimoh Balogun Street, Off CMD Road, Ikosi Ketu, Lagos State
